Howden TWIN CA46 garo turbina 1,6 MWHowden
KK&K TWIN CA46
Howden TWIN CA46 garo turbina 1,6 MW
Howden
KK&K TWIN CA46
Gamybos metai
2024
Sąlyga
Naujas
Vieta
Cremona 

Rodyti vaizdus
Rodyti žemėlapį
Duomenys apie mašiną
- Įrenginio aprašas:
- Howden TWIN CA46 garo turbina 1,6 MW
- Gamintojas:
- Howden
- Modelis:
- KK&K TWIN CA46
- Gamybos metai:
- 2024
- Sąlyga:
- naujas
- Funkcionalumas:
- visiškai funkcionalus
Kaina ir vieta
- Vieta:
- Via delle Vigne 166, 26100 Cremona, Italia

Skambinti
Techniniai duomenys
- Slėgis:
- 16 juosta
- Įėjimo dažnis:
- 50 Hz
- Įvesties srovės tipas:
- trifazis
- Temperatūra:
- 400 °C
- Įėjimo įtampa:
- 6 000 V
- Sukimosi greitis (min.):
- 1 500 aps./min
- Sukimosi greitis (maks.):
- 1 500 aps./min
- Aušinimo tipas:
- oras
Pasiūlymo informacija
- Sąrašo ID:
- A21204515
- Nuorodos Nr.:
- KK&K TWIN CA46
- Naujinta paskutinį kartą:
- Data 2026.02.10
Aprašymas
Industrial Steam Turbogenerator Howden – Model KK&K TWIN CA46, NEW, never installed and never commissioned, still covered by manufacturer’s warranty.
Following a revision of the long-term industrial strategy, a Howden KK&K TWIN CA46 steam turbogenerator, complete as per original OEM supply, is now available for sale.
The unit is NEW, manufactured and fully tested at OEM level, but never installed or put into service. It is still covered by the manufacturer’s warranty and is stored in a controlled indoor environment.
Immediate availability allows you to bypass the usual production lead times, which for this kind of equipment are typically 24–36 months.
Main supply includes:
- Steam turbine on skid with integrated gearbox
- Synchronous generator supplied separately
Turbine technical configuration:
- Model: KK&K TWIN CA46
- Dual casing turbine (Steam Part A + Steam Part B)
- 3-shaft integrated gearbox (2 pinions + central gear)
- Controlled steam extraction between HP and LP sections (included)
Main design conditions:
- Inlet steam pressure (HP): 16 bar(a)
- Inlet steam temperature: 400 °C
- Electrical output at terminals: up to 1,595 kW
- Nominal speed: 1,500 rpm
Electric generator:
Nksdpjyidvdsfx Agiju
- 3-phase synchronous generator
- Rated power: 1,994 kVA
- Voltage: 6 kV – Frequency: 50 Hz
- Cooling: IC31, air
- Brushless execution, prepared for parallel grid operation
Systems included:
- Integrated oil system in base frame
- Main mechanical oil pump and auxiliary electric oil pump
- Local control panel on skid
- Control and protection panel equipped with Siemens SIPROTEC 5
- Electronic speed and pressure governor
- Independent overspeed protection device
- Turbogenerator simulation model ENC-RfG
Typical applications:
- Industrial cogeneration plants
- Process steam energy recovery
- Biomass and waste-to-energy plants
- Combined production of electricity and process steam
Status and conditions:
- Condition: NEW
- Year of manufacture: late 2024
- Never installed – never commissioned
- Still under manufacturer’s warranty
- Complete OEM technical documentation available
- Possibility of installation and commissioning with manufacturer support
Possible fields of application:
- Biomass and waste-to-energy plants, for production of electricity and process steam, with immediate unit availability — no multi-year production lead times
- Industrial cogeneration (CHP) in plants with continuous process steam usage (paper, food, chemical, and manufacturing industries)
- Revamping/repowering of existing plants, as a fast-track alternative to new OEM supplies with 24–36 month delivery times
Price: Upon request.
Further technical information and documentation available upon request.
Skelbimas verčiamas automatiškai, todėl jame gali būtų vertimo klaidų.
Following a revision of the long-term industrial strategy, a Howden KK&K TWIN CA46 steam turbogenerator, complete as per original OEM supply, is now available for sale.
The unit is NEW, manufactured and fully tested at OEM level, but never installed or put into service. It is still covered by the manufacturer’s warranty and is stored in a controlled indoor environment.
Immediate availability allows you to bypass the usual production lead times, which for this kind of equipment are typically 24–36 months.
Main supply includes:
- Steam turbine on skid with integrated gearbox
- Synchronous generator supplied separately
Turbine technical configuration:
- Model: KK&K TWIN CA46
- Dual casing turbine (Steam Part A + Steam Part B)
- 3-shaft integrated gearbox (2 pinions + central gear)
- Controlled steam extraction between HP and LP sections (included)
Main design conditions:
- Inlet steam pressure (HP): 16 bar(a)
- Inlet steam temperature: 400 °C
- Electrical output at terminals: up to 1,595 kW
- Nominal speed: 1,500 rpm
Electric generator:
Nksdpjyidvdsfx Agiju
- 3-phase synchronous generator
- Rated power: 1,994 kVA
- Voltage: 6 kV – Frequency: 50 Hz
- Cooling: IC31, air
- Brushless execution, prepared for parallel grid operation
Systems included:
- Integrated oil system in base frame
- Main mechanical oil pump and auxiliary electric oil pump
- Local control panel on skid
- Control and protection panel equipped with Siemens SIPROTEC 5
- Electronic speed and pressure governor
- Independent overspeed protection device
- Turbogenerator simulation model ENC-RfG
Typical applications:
- Industrial cogeneration plants
- Process steam energy recovery
- Biomass and waste-to-energy plants
- Combined production of electricity and process steam
Status and conditions:
- Condition: NEW
- Year of manufacture: late 2024
- Never installed – never commissioned
- Still under manufacturer’s warranty
- Complete OEM technical documentation available
- Possibility of installation and commissioning with manufacturer support
Possible fields of application:
- Biomass and waste-to-energy plants, for production of electricity and process steam, with immediate unit availability — no multi-year production lead times
- Industrial cogeneration (CHP) in plants with continuous process steam usage (paper, food, chemical, and manufacturing industries)
- Revamping/repowering of existing plants, as a fast-track alternative to new OEM supplies with 24–36 month delivery times
Price: Upon request.
Further technical information and documentation available upon request.
Skelbimas verčiamas automatiškai, todėl jame gali būtų vertimo klaidų.
Tiekėjas
Pastaba: Užsiregistruokite nemokamai arba prisijunkite, kad gautumėte visą informaciją.
Registruota nuo: 2024
Pateikti užklausą
Telefonas & Faksas
+39 334 6... skelbimai
Šie skelbimai taip pat gali jus sudominti.
Mažas skelbimas
Freising
1 123 km
Pilna alaus darykla
Diverse
Diverse
Mažas skelbimas
Radeberg
802 km
Nerūdijančio plieno išcentrinis siurblys Cheminis standartinis siurblys
Sulzer 75kW ; 250m³/h ; 27mZA200-450
Sulzer 75kW ; 250m³/h ; 27mZA200-450
Mažas skelbimas
Güglingen
1 220 km
Aušintuvas, aušintuvas
Hitema ENR 075 Prozess Kaltwassersatz
Hitema ENR 075 Prozess Kaltwassersatz
Mažas skelbimas
Russy-Bémont
1 564 km
Elektros transformatorius
Entreprise Redonnaise d’ElectricitéN84-820
Entreprise Redonnaise d’ElectricitéN84-820
Mažas skelbimas
Fumane (Verona)
1 410 km
Pasterizatorius
Tecnoindustria
Tecnoindustria
Mažas skelbimas
Bydgoszcz
442 km
AB LAGER lazerinis 3kW rotatorius 6000x220
OtinusFLV-3015-OT-6022 3kW
OtinusFLV-3015-OT-6022 3kW
Mažas skelbimas
Menslage
1 081 km
Monoblokas VVF14/3 Pripildymo linija Stikliniai buteliai
H & KAbfülllinie für Glasflaschen (Mehrweg)
H & KAbfülllinie für Glasflaschen (Mehrweg)
Mažas skelbimas
Hessisch Lichtenau
1 040 km
Vertikali daugiaetapė aukšto slėgio išcentrinė pompa, beveik nauja išcentrinė pompa atsarginėms dali
GRUNDFOSCRN 10-09 MP-FGJ GI-V
GRUNDFOSCRN 10-09 MP-FGJ GI-V
Mažas skelbimas
Agios Athanasios
1 569 km
Generatorius
MAN GENERATOR
MAN GENERATOR
Mažas skelbimas
Freiberg am Neckar
1 216 km
Išcentrinis siurblys
Grundfos GmbHMTR20-19/6 A-W-A-HQQV
Grundfos GmbHMTR20-19/6 A-W-A-HQQV
Jūsų skelbimas sėkmingai pašalintas
Įvyko klaida
















































































































