Garo turbina1. Brněnská strojírna
Turbocharger set 6,2MW
Garo turbina
1. Brněnská strojírna
Turbocharger set 6,2MW
EXW Pradinė kaina neįskaitant PVM
320 000 €
Gamybos metai
1972
Sąlyga
Naudotas
Vieta
Čekijos Respublika 

Rodyti vaizdus
Rodyti žemėlapį
Duomenys apie mašiną
- Įrenginio aprašas:
- Garo turbina
- Gamintojas:
- 1. Brněnská strojírna
- Modelis:
- Turbocharger set 6,2MW
- Gamybos metai:
- 1972
- Sąlyga:
- naudotas
- funkcionalumas:
- visiškai funkcionalus
Kaina ir vieta
EXW Pradinė kaina neįskaitant PVM
320 000 €
- Vieta:
- 117, Vratimovská 689, 719 00 Slezská Ostrava, Czechia
Skambinti
Techniniai duomenys
- Slėgis:
- 19 juosta
- Galia:
- 6 200 kW (8 429,64 AG)
- Dažnis:
- 50 Hz
- Įvesties srovės tipas:
- Oro kondicionierius
- Temperatūra:
- 320 °C
- Bendras aukštis:
- 2 800 mm
- Sukimosi greitis (maks.):
- 7 100 aps./min
- Bendras ilgis:
- 4 500 mm
Pasiūlymo informacija
- Sąrašo ID:
- A19313921
- Nuorodos Nr.:
- TK56/2
- Naujinta paskutinį kartą:
- Data 2025.06.06
Aprašymas
1. Brněnská strojírna, Turbocharger Unit, Condensing Steam Turbine, Overpressure Type 6.2 MW
Manufacturer: 1. Brněnská strojírna
Power Output: 6,200 kW
Model: T6.2/6.2
Speed: 7,100 RPM
Steam Pressure: 19 bar
Steam Temperature: 320 ºC
Year of Manufacture: 1972. The equipment has undergone all necessary maintenance to ensure maximum reliability, availability, and capacity.
Dimensions: 2,800 x 2,800 x 4,500 mm
Dcodpfx Aswqqkbsdmjn
Includes gearbox, compressor, condenser pumps, oil system, and all associated electrical and instrumentation & control (I&C) equipment.
Full technical documentation will be provided upon request.
This machine has been regularly maintained and serviced since commissioning. Major and routine overhauls (GO and SO) have generally taken place every five years, adapted to actual operating conditions. Repairs have been carried out by the original turbine and compressor manufacturer. Following inspection and diagnostics in 2016, a subsequent major overhaul (GO) was completed during 2016–2017, with total costs amounting to CZK 79.3 million.
Skelbimas verčiamas automatiškai, todėl jame gali būtų vertimo klaidų.
Manufacturer: 1. Brněnská strojírna
Power Output: 6,200 kW
Model: T6.2/6.2
Speed: 7,100 RPM
Steam Pressure: 19 bar
Steam Temperature: 320 ºC
Year of Manufacture: 1972. The equipment has undergone all necessary maintenance to ensure maximum reliability, availability, and capacity.
Dimensions: 2,800 x 2,800 x 4,500 mm
Dcodpfx Aswqqkbsdmjn
Includes gearbox, compressor, condenser pumps, oil system, and all associated electrical and instrumentation & control (I&C) equipment.
Full technical documentation will be provided upon request.
This machine has been regularly maintained and serviced since commissioning. Major and routine overhauls (GO and SO) have generally taken place every five years, adapted to actual operating conditions. Repairs have been carried out by the original turbine and compressor manufacturer. Following inspection and diagnostics in 2016, a subsequent major overhaul (GO) was completed during 2016–2017, with total costs amounting to CZK 79.3 million.
Skelbimas verčiamas automatiškai, todėl jame gali būtų vertimo klaidų.
Tiekėjas
Pastaba: Užsiregistruokite nemokamai arba prisijunkite, kad gautumėte visą informaciją.
Registruota nuo: 2025
Pateikti užklausą
Telefonas & Faksas
+420 370 ... skelbimai
Šie skelbimai taip pat gali jus sudominti.
mažas skelbimas

707 km
Garo turbina
1. Brněnská strojírnaTurbocharger set 6,2MW
1. Brněnská strojírnaTurbocharger set 6,2MW
Jūsų skelbimas sėkmingai pašalintas
Įvyko klaida